Перейти к основному содержанию

page search

Library China Watershed Management Project : Development of a Monitoring and Evaluation System, Final Report

China Watershed Management Project : Development of a Monitoring and Evaluation System, Final Report

China Watershed Management Project : Development of a Monitoring and Evaluation System, Final Report

Resource information

Date of publication
июня 2012
Resource Language
ISBN / Resource ID
oai:openknowledge.worldbank.org:10986/8168

The objective of this assignment was to develop a Monitoring and Evaluation (M&E) system for watershed management in the Loess Plateau area. The M&E system for the China Watershed Management Project (CWMP) has been developed on the base of the M&E system that has been implemented during the previous two phases of the World Bank Loess Plateau Project. The final report presents the main outcomes of this process. The major findings of the M&E systems review are summarized in the following chapter two. The steps of developing and agreeing the M&E framework are presented in chapter three. Chapter four will describe the specific features of and challenges for watershed M&E before chapter five goes into a detailed presentation of the M&E framework. The M&E framework is most significant outcome of this assignment because it brings together all the agreements and considerations around institutional and methodological issues of M&E. The key parameters for M&E are defined in the framework, but they are further specified into operational steps in the M&E guidelines which are prepared as a separate document.

Share on RLBI navigator
NO

Authors and Publishers

Author(s), editor(s), contributor(s)

World Bank

Publisher(s)
Data Provider
Geographical focus